Drainage System at the Adult Detention Facility
BID DATE
06/11/15 - 2:00
AGENCY
Santa Fe County
ESTIMATE
n/a
SCOPE
SFC desires contractor services for the demolition of 2 (two) existing water catchment structures. Once structures are removed the water catchment system will be replaced with the installation of 8 (eight) plastic catch basins, crates and 8” plastic drainage pipe. Channel existing concrete for placement of new plastic catch basins and drainage pipe. The new catch basins are to be installed below each downspout for collection of water and distribution through plastic piping and diverted to the existing retention ponds. Currently there are a total of 8 (eight) downspouts draining into the two existing storm water catchment structures which will be removed by contractor prior to installation of the catch basins. There are 3 (three) down spouts at the northeast side and 5 (five) at the northwest side. The existing metal down spouts will remain and be extended down to drain into the new catch basins and then divert the storm water to the existing retention ponds through plastic piping. On the Northeast side of the facility the existing concrete below the downspouts will need to be channeled for installation of the plastic catch basins and plastic drainage pipe. The existing concrete sidewalks will also need to be channeled for placement of an 8” ABS plastic pipe. The new 8” ABS pipe will be connected to the new drainage pipe coming from the catch basins to divert water through a new drainage swale that will drain water into the existing retention pond. On the Northwest side the existing concrete will need to be channeled for installation of the plastic catch basins/crates and drainage pipe. The new catch basins and drainage pipe will connect to an existing 8” ABS pipe that currently drains into the existing retention pond. Stucco will need to be repaired on the wall adjacent to the newly installed catch basins. Provide power for eight (8) additional electrical outlets. The proposed outlets will provide power for new heat cables to be installed to prevent the downspouts from freezing. Power will be supplied from panel No. LV-EE located in the main electrical panel room. The approximate distance from the electrical panel location to the proposed outlets is approximately 400 linear feet and will be run over the roof along the inside of the existing parapets to the downspout locations. Iris Cordova, Procurement Specialist, Senior at icordova@santafecountynm.gov
PREBID
4/17/2015 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT