Access the Full Project by Clicking here!
Bidjugde
JOB
Rfb 6273 Citywide Waterline Repair Replace Large Diameter Idiq
BID DATE
01/29/25 - 3:00
AGENCY
Corpus Christi
ESTIMATE
$4,999,625
SCOPE
Large-sized project consists of removal and abandonment of existing 6" to 24" (max) waterlines and the installation of new 6" to 24" (max) waterlines. Based on discussions with CCW staff, the large-sized program is typically executed in arterial / collector rights-of-way and for emergency repairs. This IDIQ contract will be used to complete planned and emergent work for removal and disposal, or salvage, of existing water pipelines, valves, fixtures, fire-hydrants and related appurtenances; installation of new waterlines by open trenching or horizontal directional drilling: installation of casing pipe, fire hydrants, valves, fittings, services, and related appurtenances; connection / reconnection to existing waterlines, reconnection of interrupted services, and installation of new services, excavation and backfill, repair of asphalt and concrete pavement, sidewalks, driveways, curb and gutter, stormwater control, and other related miscellaneous items required to complete the required scope of work. https://www.civcastusa.com/project/676480b0a619a9ab2f65ead6/summary betsyr@cctexas.com
PREBID
1/8/2025 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT