Access the Full Project by Clicking here!
Bidjugde
JOB
FY25 Cave Creek Water Meter Installation
BID DATE
01/29/25 - 10:00
AGENCY
Cave Creek
ESTIMATE
n/a
SCOPE
replace approximately 1,600 water meters ranging in size from 3/4 to 1-inch throughout the Town’s water system (see Attachment D). The Town has already pre-purchased Neptune water meters for the project. In addition to replacing the old meters, the project will update the Town to an Advanced Metering Instructure (AMI) system. The Town has already installed five data collector sites that will gather data from an estimated 80% of the new meters. It is expected that 20% of the meter replacements will require cellular endpoints, which will be provided by the Town. Deputy Director of Utilities, Nicholas Larssen, at nlarssen@cavecreekaz.gov https://www.cavecreekaz.gov/bids.aspx?bidID=24
PREBID
1/14/2025 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT