Access the Full Project by Clicking here!
Bidjugde
JOB
Cottonwoods Detention Facility The Compton Drain
BID DATE
01/27/25 - 4:30
AGENCY
Fruita
ESTIMATE
n/a
SCOPE
"The general Scope of Work for the Cottonwood Detention Facility & Compton Drain will include but may not be limited to the following: Removal and Disposal of all material obstructing the flow of the drain in the detention area as well as in the open Compton ditch. Jetting and Cleaning 1,200 LF of 15” HDPE Pipe Exposing and Cleaning +/- 13 Pipe Inlets & Grates Cleaning 36” Concrete Manhole. Clearing and Cleaning of +/-80’ of 36” Culvert. Rechanneling of the facility. Refurbish/Rebuild Pedestrian-Bike Paths Damaged by Erosion and/or Construction. Replace property damaged during construction, i.e., Landscaping, Irrigation, Fences, etc. Install Rip/Rap Erosion control around the east pipe inlet. Stormwater Management/Erosion Control https://www.bidnetdirect.com/colorado/solicitations/open-bids/Cottonwoods-Detention-Facility-The-Compton-Drain/0000371675?purchasingGroupId=8409951&origin=2 merickson@fruita.org "

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT