Access the Full Project by Clicking here!
Bidjugde
JOB
2025 Major Roads
BID DATE
01/10/25 - 4:00
AGENCY
Evans
ESTIMATE
n/a
SCOPE
Will consist of a 3” inch Mill and Overlay of 23rd Avenue from 32nd Street to 37th Street. The roadway is believed to be (12”) Twelve-inch thickness of asphalt mat over (8”) Eight-inch Class 6 Base Material. In-situ earthen material is sandy clay loam. Potholing of this roadway is not expected, but a line item is added to the bid schedule if it becomes necessary. https://www.bidnetdirect.com/colorado/solicitations/open-bids/2025-Major-Roads-Project/0000371349?purchasingGroupId=8409951&origin=2 atamburelli@evanscolorado.gov lblasco@evanscolorado.gov
PREBID
1/2/2025 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT