Access the Full Project by Clicking here!
Bidjugde
JOB
Phoenix Globe Hwy (NH-060-D(208)S)
BID DATE
06/19/15 - 11:00 LIVE!
AGENCY
ADOT
ESTIMATE
$45,000,000
SCOPE
The proposed Construct New Roadway project is located in Pinal County, with the western limit located approximately 27 miles east of the Town of Apache Junction (approximately 11 mile east of the intersection of US 60 and SR 79) beginning at MP 221.72 and extending easterly beyond the SR 177 TI to MP 226.87, for approximately 5.1 miles. The work includes reconstructing the existing two-lane undivided roadway into a four-lane divided highway and reconstructing the existing three-lane roadway into a four-lane roadway with a raised median. The work also includes seven new structures, one structure widening and three structure rehabilitations. The work consists of installing asphaltic concrete and asphalt rubber asphaltic concrete friction course; concrete bridge structures; reinforced concrete box culverts ; pipe culverts; riprap and gabions; curb and gutter; raised medians; sidewalks; fence; striping; signing; lighting; guardrail; seeding; utility trenching; and other related work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT