Access the Full Project by Clicking here!
Bidjugde
JOB
High Zone Transmission Main
BID DATE
01/8/25 - 2:00
AGENCY
Horseshoe Bay
ESTIMATE
$4,600,000
SCOPE
This project will consist of constructing approximately 12,300 linear feet of 16-inch HDPE and 100 LF 12-in PVC water main, 4 – 16-inch gate valves; 4 – 12-in gate valves; and 1 – 6” gate valve, 4 – combination air release valves, 120 LF 24-in steel casing and 120 LF 8-in steel casing, connection to pump station pump house, and surface repairs. https://www.civcastusa.com/project/675c541ce90030ad18cc64b8/summary stuart.w.cowell@gmail.com
PREBID
12/19/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT