Sun Valley Parkway Restoration Phase 5
BID DATE
01/16/25 - 2:00 REAL-TIME
AGENCY
Maricopa County
ESTIMATE
n/a
SCOPE
Proposed work consists of full depth milling of the existing asphalt pavement and replacing with five inches new asphalt pavement (1.5 inches PMTR of ½ inch Superpave for Low Traffic on 3.5 inches of ¾ inch Superpave for High Traffic) on existing Aggregate Base. Re-grading existing aggregate base, proof rolling, installation of pavement markings, dispose of millings at two stockpile locations and other miscellaneous work is included in this project. The project length is approximately 2.0 miles. Corry.Slama@Maricopa.Gov https://www.bidsync.com/bidsync-app-web/vendor/links/BidDetail.xhtml?bidid=2130584