Access the Full Project by Clicking here!
Bidjugde
JOB
Davis Lane Lift Station Gravity Main Improvements
BID DATE
01/23/25 - 2:00
AGENCY
San Marcos - TX
ESTIMATE
$2,319,007
SCOPE
Water Supply, Groundwater, Sewage Treatment, and Related Equipment, Not for AC, Steam Boiler, or Lab. Includes but is not limited to reversing flow by reconstructing a portion of the gravity main (approx. 350 LF) on Davis Lane and installing a gravity main crossing across Davis Lane; constructing a lift station capable of 1,000 GPM flow; and constructing 10” and 6” HDPE force main (approx. 50 LF) and tie into existing 10” and 6” force main. https://www.sanmarcostx.gov/bids.aspx?bidID=679 RShelton@sanmarcostx.gov
UPDATES