Horizon Drive G Road Roundabout
BID DATE
01/17/25 - 12:00
AGENCY
Grand Junction
ESTIMATE
n/a
SCOPE
The Horizon Drive & G Road intersection, located at the base of the Horizon Drive Business Improvement District, will be reconstructed, and the existing signalized intersection will be removed and replaced by a two-lane roundabout. Approximate quantities are as follows: 3,662 CY of Unclassified Excavation (CIP), 147 tons of asphalt pavement, 6,700 SY of concrete pavement, 3,443 LF of curb and gutter, 1,004 SY of concrete sidewalk, 3,300 LF of irrigation piping, 264 LF of plastic storm drain piping, 42 LF of gravity sewer piping, 4,000 LF of electrical conduit, 16 pedestrian lights, landscaping, and irrigation. https://www.bidnetdirect.com/private/solicitations/4563923216/abstract/show-history?utm_campaign=amendment_notification&utm_source=system_vendor&utm_medium=email&utm_content=body-sol_abstract_history_link dollyd@gjcity.org "