Access the Full Project by Clicking here!
Bidjugde
JOB
Newport Boulevard Water Main Replacement Via Oporto 28th Street
BID DATE
04/28/15 - 10:00
AGENCY
Newport Beach
ESTIMATE
$3,400,000
SCOPE
The work necessary for the completion of this contract consists of: the abandonment of the 20-inch/16-inch diameter cast iron water transmission main; the construction of a 24- inch water transmission main replacement including all appurtenances, fittings, and connections within Newport Boulevard within this stretch of the street; the abandonment of several adjacent smaller size cast iron distribution mains; and the construction of the 6-inch/8-inch/10-inch and 12-inch replacement distribution water mains. Newport Boulevard (26th Street to 19th Street) - The work necessary for the completion of this contract consists of: the abandonment of the 16-inch diameter cast iron water transmission main; and the construction of a 16- inch water transmission main replacement including all appurtenances, fittings, services, and connections within Newport Boulevard within this stretch of the street. Sewer Replacement/Repair - The work necessary for the completion of this contract consists of: the spot repair of portions of several existing sewer mains; the reconstruction of existing sewer from manhole to manhole in Finley Ave. (West); and the reconstruction of existing sewer from manhole to just outside of an existing OCSD manhole in Newport Blvd. The work necessary for the completion of this contract includes providing traffic control, dewatering, and pavement replacement per the Contract Documents.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT