Access the Full Project by Clicking here!
Bidjugde
JOB
East Ovilla Road Txdot Utility Relocation
BID DATE
12/19/24 - 2:00
AGENCY
Ellis County
ESTIMATE
n/a
SCOPE
The project includes constriction of approximately two-thousand seven hundred (2,700) linear feet of 6 to 8-inch water line, one-thousand five hundred (1,500) linear feet of 6 to 10-inch wastewater line, and one-thousand one hundred (1,100) linear feet of 2 to 4-inch force main as detailed in the Construction Plans and Specifications. The wastewater and water lines begin on the west side of SH 342 approximately at the intersection of South Ryan Drive and East Ovilla Road, continuing east along East Ovilla Road before reaching Methodist Street. The force main begins on the east side of SH 342 approximately at the intersection of Cobblestone Circle and East Ovilla Road and continues east until reaching an access road at Red Oak Eastridge Elementary. https://www.civcastusa.com/project/674639babc50827d8f6d687a/summary stuart.williams@kimley-horn.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT