Access the Full Project by Clicking here!
Bidjugde
JOB
McNeil Drive Water Transmission Main
BID DATE
02/27/25 - 2:00
AGENCY
Austin
ESTIMATE
$43,000,000
SCOPE
This project scope includes installation of approximately 8,500 LF of 72-inch water transmission main from the Austin Water – Jollyville Reservoir site to the existing downstream connection point, located in McNeil Drive near Parmer Lane. This water pipeline is necessary to eliminate the distribution constraint that exists between the Handcox Water Treatment Plant and Martin Hill Reservoir. This project is located within the Edwards Aquifer Recharge Zone, therefore, karst monitoring, reporting, and mitigation requirements are included in the Contract Documents. https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=139078 gabriel.castano@austintexas.gov blake.martin@austintexas.gov smbrcompliancedocuments@austintexas.gov Plans - https://assets.austintexas.gov/financeonline/downloads/vc_files/CSP_6100_CLMB343/CSP_6100_CLMB343_PLANS_v1.pdf
UPDATES