JOB
2015 Pavement Reconstruction
BID DATE
05/5/15 - 2:00
AGENCY
Moraga
ESTIMATE
$1,980,400
SCOPE
mobilization; traffic control and construction signage; clearing and grubbing including tree trimming; traffic striping, traffic markings, and markers removal; removal and replacement of concrete sidewalk, curb ramps, curb and gutter; replacement of fence; over-excavation if required, conform grinding, removal of asphalt concrete (AC) and aggregate base (AB), placement of AB, hot mix asphalt (HMA) and rubberized hot mix asphalt (RHMA) overlay; adjusting of utility features (e.g. water valve boxes, sanitary and storm drain manhole frame and covers); storm drain pipe repair and cleaning; placement of thermoplastic traffic stripes, pavement markers, and thermoplastic pavement markings; and all other work publicworks@moraga.ca.us
PREBID
4/15/2015 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT