Access the Full Project by Clicking here!
Bidjugde
JOB
Storm Drainage Repair Alderpoint Rd
BID DATE
05/12/15 - 2:00
AGENCY
Humboldt County
ESTIMATE
$1,093,000
SCOPE
The roadwork to be done consists, in general, of, traffic control, clearing and grubbing, earthwork to construct stabilization trenches at five locations and realigned roadway, installation of culverts and underdrains, placing rock slope protections, surfacing of the roadway with aggregate base and hot mix asphalt and painting traffic stripes. This work also includes temporary water pollution control, as needed and installation of erosion control for permanent soil stabilization.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT