Henry Miller Area Storm Drain and L Street Waterline
BID DATE
05/1/15 - 2:00
AGENCY
Los Banos
ESTIMATE
n/a
SCOPE
The major WORK consists of furnishing and installing approximately 3,365 linear feet of waterline and trench patch, installing 27 water valves, transferring 17 water services, replacing 4 fire hydrant assemblies, connecting to 2 existing fire hydrants, furnishing and installing approximately 3,500 linear feet of storm drain line and trench patch, constructing 14 manholes, constructing 3 catch basins, and installing sewer lateral reconnections in the City of Los Banos. The time for completion is fifty five (55) working days.