SCOPE
The work to be performed under the provisions of these Contract Documents consists of installation of 4,500 linear feet of 48-inch water distribution pipe beginning at the tee south of the discharge of the proposed Frisco Pump Station No. 4 and heading west through an existing easement within the Villages at Willow Bay neighborhood and connecting to an existing 48-inch stub out by Coit Rd. The work also includes installation of approximately 500 linear feet of 36-inch water distribution pipe beginning at the tee south of the discharge of the proposed Frisco Pump Station No. 4 and connecting to an existing 36-inch stub-out to the east of the pump station between the school’s running tracks. The work will include two flow meter vaults to house Frisco’s flow meters. Work includes installation of approximately 3,600 LF of a hike and bike trail with trees and associated irrigation system. https://friscotexas.bonfirehub.com/opportunities/161432

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT