East Nees Avenue Asphalt Concrete Overlay Millbrook Avenue
BID DATE
05/5/15 - 3:00
AGENCY
Fresno
ESTIMATE
$450,000
SCOPE
The scope of work includes, but is not limited to, conform grinding the existing asphalt concrete pavement and overlaying with new asphalt concrete; replacing pavement striping and markings; replacing traffic signal loop detectors; installing additional traffic signs; raising sewer and storm drain manholes and water valves to finished grade; removing and replacing concrete curb & gutter and wheelchair ramps at the returns in accordance with the current ADA requirements; removing portions of raised concrete island noses from crosswalk areas and replacing them per the current City Standards, complete in place. Mike Brown - 559-621-1165 Mike.Brown@Fresno.gov