Access the Full Project by Clicking here!
Bidjugde
JOB
Valle Verde Pittman Wash Sewer Repair
BID DATE
12/3/24 - 3:00
AGENCY
Henderson
ESTIMATE
$1,200,000
SCOPE
This project shall consist of the abandonment of 105 LF damaged 18-inch sewer beneath the bridge structure at Valle Verde Drive and the Pittman Wash crossing. Realignment of approximately 270 LF 18-inch sewer will be constructed adjacent to the existing concrete apron and tie into the existing 24-inch sewer under the northerly access road in the wash. An extended concrete apron and cutoff wall will be constructed in the wash. Surface water diversion, sewer bypass pumping, and traffic control are required to facilitate construction of the sewer main. amy.carpenter@cityofhenderson.com
PREBID
11/4/2024 4:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT