Access the Full Project by Clicking here!
Bidjugde
JOB
Rock Springs Valve Replacement
BID DATE
02/11/25 - 2:00
AGENCY
Vallecitos WD
ESTIMATE
$350,000
SCOPE
Removal and replacement of one 14-inch valve, two 10-inch valves; demolition of water manhole frame and cover; installation of new 18-inch valve, steel cross, reducer, cathodic protection, piping and appurtenances; fire watch to meet City of San Marcos Fire Department requirements; pipeline dewatering; and other work as more fully described in the Contract Documents. https://www.vwd.org/departments/engineering/capital-facilities/cip-projects-out-to-bid https://www.vwd.org/departments/engineering/capital-facilities/cip-projects-out-to-bid
UPDATES