JOB
Glo Cdbg Mit Sewer Improvements
BID DATE
11/20/24 - 10:00
AGENCY
Shepherd
ESTIMATE
$3,400,000
SCOPE
Bids are invited for several items and quantities of work as follows: I. PACKAGE 1: • Replace existing 6-inch and 8-inch VCP gravity flow pipe with approximately 2.1 miles of 8” and 1.6 miles of 10” DR-17 IPS HDPE by pipe bursting. • Replace associated manholes • Reconnect services • Associated work II. PACKAGE 2 • Replace existing 6-inch and 8-inch VCP gravity flow pipe with approximately 3.3 miles of 8” DR-17 IPS HDPE by pipe bursting. • Replace associated manholes Reconnect services • Replace lift station wet well, piping, and pumps, and convert existing wet well to manhole • Construct 513 LF of 6” SDR-21 PVC Force Main • Rehabilitate 13 manholes • Associated work https://www.civcastusa.com/project/671c0366bcbae18b4d943922/summary jmorris@glstexas.com