Access the Full Project by Clicking here!
Bidjugde
JOB
Mulholland Scenic Corridor Improvements Phase III
BID DATE
04/20/15 - 2:30
AGENCY
Calabasas
ESTIMATE
n/a
SCOPE
The Measure R Mulholland Highway Corridor Improvements Phase III project will improve traffic safety along the corridor between Paul Revere Dr. and Mulholland Drive and between Old Topanga Canyon Road and Declaration Ave. The project to be constructed consists of roadway widening; installation of landscaped medians; construction of retaining walls with associated earthwork; paving; construction of sidewalk; ADA ramps; curb and gutter; landscape and hardscape; electrical work; signing and striping, storm drain modifications and the installations of a bio-swale and an in-pavement flashing crosswalk and other miscellaneous work as required by plans and specifications. Pauline Rubio-Brownell at (818) 224-1678, or by email at pbrownell@cityofcalabasas.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT