Access the Full Project by Clicking here!
Bidjugde
JOB
Bacliff Drainage Improvements
BID DATE
11/25/24 - 2:00
AGENCY
Galveston County
ESTIMATE
$2,500,000
SCOPE
The project consists of improvements to the N16-East channel from 10th St to the weir crossing with a grass-lined bench cut section on the south and maintenance of N16-West channel from 20th St to 10th St. The outfall pipes into the Galveston Bay, east of Bayshore Dr will be replaced and the channel above the boxes will include a concrete slab at the bottom, and Articulating Concrete Blocks (ACB’s) on the side slopes. The low flow water crossing across the 10th St ditch shall be replaced with an improved concrete lined section. The scour hole downstream of the low flow utility crossing shall be filled as shown in plans Three (3) of the seven (7) culvert crossings across the N16 and 10th St channels will be replaced and one of them will be removed. The Traffic Control Plan must be followed to gain access to the Bayshore outfall site from the FM 646 road. Because the culverts will be placed at 15th Street, a traffic plan involving road closures and detours must be followed. https://www.civcastusa.com/project/671a9ebca1640ed279304ae7/summary purchasing.bids@co.galveston.tx.us
PREBID
11/5/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT