Access the Full Project by Clicking here!
Bidjugde
JOB
(JOC) General Utility
BID DATE
11/26/24 - 2:00
AGENCY
Gilbert
ESTIMATE
$20,000,000
SCOPE
The following work activities may be included as part of a Job Order: 1. Installation of new water, reclaimed water, wastewater and storm water infrastructure and required appurtenances and incidentals; 2. Rehabilitation of existing water, reclaimed water, wastewater and storm water infrastructure and required appurtenances and incidentals; 3. Assist with public notification, public notices and attend public meetings; 4. Obtain all necessary permits required to complete the project, including but not limited to: haul route, stockpile, SWPPP, dust control, traffic control plans, MCESD Approval to Construct (ATC), and MCESD Approval of Construction (AOC); 5. Installation of asphalt pavement including full depth rehabilitation, grind and overlays, seals and repairs to restore areas damaged by construction; 6. Installation of concrete pavement including curb and gutter, driveways, sidewalks, to restore areas damaged by construction; 7. Installation of landscaping to restore areas damaged by construction; 8. Design, installation, operation and maintenance of bypass pumping operations; 9. Pipeline pressure testing and disinfection services; and 10. Utility locating (potholing) underground utilities and obstructions. jed.ward@gilbertaz.gov
PREBID
11/11/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT