Access the Full Project by Clicking here!
Bidjugde
JOB
Sewer Main Replacement Phase II
BID DATE
11/19/24 - 3:00
AGENCY
Bullhead
ESTIMATE
n/a
SCOPE
This project consists of the removal and replacement of up to 160 feet of 24-inch sewer main located on the east side of Highway 95 North of Merrill Ave and South of Rio Rancho Blvd. The existing sewer main was constructed of 24-inch HDPE and shall be replaced with 24-inch SDR35 PVC. This section of sewer main has been crushed due to infiltration of dirt and rock between the 36-inch ADS sleeve and the 24-inch HDPE. An emergency replacement project was initiated in December 2023 which replaced approximately 103 feet of pipe. A temporary connection was made using a concrete encasement to prevent any sewage loss, and to prevent any further damage to the existing main. This concrete encasement is located approximately 103 feet south of MH-15921 and must be removed to make connection to the existing SDR35 PVC. The pipe replacement for this project will continue from this point to the south, up to 160 feet in length. jrenfroe@bullheadcityaz.gov https://www.bullheadcity.com/Home/Components/RFP/RFP/282/462
PREBID
11/7/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT