Access the Full Project by Clicking here!
Bidjugde
JOB
Suncrest Drive Detention Basin 174
BID DATE
11/20/24 - 2:00
AGENCY
Draper
ESTIMATE
n/a
SCOPE
The scope of this project will be to provide all the labor, materials, tools and equipment necessary to complete improvements to detention basin #174 off of Suncrest Drive as described in the project plans and specifications. This includes clearing and grubbing additional area for the basin improvements, installation of a riprap grouted collection area, a flared end section, waterway, a new detention control structure, a new 24-in RCP storm drain pipe, and modifications to the existing storm drain manholes. Dillon Bliler Dillon.Bliler@draperutah.gov Robert Markle +801 (576) 6360 robert.markle@draper.ut.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT