Access the Full Project by Clicking here!
Bidjugde
JOB
El Porvenir Bridge NM ERFO FS SNTFE 2022
BID DATE
11/26/24 - 2:00
AGENCY
Department Transportation
ESTIMATE
$5,000,000
SCOPE
The proposed improvements include a new bridge west of the previously destroyed structure. The replacement bridge is planned to be a prefabricated steel structure with a span of 97 feet and a width of 16 feet. The bridge will be founded on drilled shafts with a structural metal decking and reinforced concrete topper. In addition, the scope includes removal of an existing low water crossing, which is serving as a temporary diversion for traffic along the route, and obliteration of a portion of the existing road. Embankment work will be required for the realignment of the aggregate surfaced road. CFLcontracts@dot.gov https://sam.gov/opp/107a7b8d3d054026a75df804be357b0d/view
UPDATES