Access the Full Project by Clicking here!
Bidjugde
JOB
2024 CDBG Sidewalk ADA Curb Ramp Improvements
BID DATE
11/14/24 - 2:00
AGENCY
El Centro
ESTIMATE
$800,000
SCOPE
This work shall consist of: General demolition including saw cutting of concrete and asphalt, demolition of concrete sidewalks, curbs gutters, driveways, curb ramps, alley approaches and demolition of street areas along with associated construction waste disposal. Construction work will include installation of new sidewalks, curbs, gutters, alley approaches, curb ramps and driveways, along with AC joiner strips, and survey monument preservation. Relocation of traffic signs and raising of utility valves may also be required. Temporary traffic control shall be provided. https://vendors.planetbids.com/portal/41180/bo/bo-detail/122685 acampos@cityofelcentro.org
PREBID
10/24/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT