Access the Full Project by Clicking here!
Bidjugde
JOB
Access Navarro Mills Lake TX FLAP FM 709
BID DATE
10/30/24 - 2:00
AGENCY
Department Transportation
ESTIMATE
$10,000,000
SCOPE
The proposed project is anticipated to be full depth reclamation, shoulder widening, and asphalt concrete pavement (ACP). In addition, the project will add guardrail, replace bridge transition rail, guardrail end terminals, mow strips, extend or replacement culverts and install safety end treatments to drainage structures. The roadway will be widened to 11-foot lanes and 3-foot shoulders. Signing and pavement markets and rumble strips will be included to improve safety. 7,820 Embankment Construction 29,000 tons of Aggregate base 49,750 square yards of Recycled aggregate base, 9-inch depth (with cement) 7000 Tons of Asphalt Concrete Pavement 4000 hours of temporary traffic control, flagger 60 Linear feet, 5 feet span, 3 feet rise reinforced concrete box culvert, triple barrel. 20 liner feet, 4 feet span, 4 feet rise precast reinforced concrete box culvert 390 linear feet, 30-inch pipe culvert (concrete) 660 linear feet, 24-inch pipe culvert (concrete) 210 linear feet, 54-inch pipe culvert (concrete) cflacquisitions@dot.gov https://sam.gov/opp/bb3c23bf3daa4f899cf29cdd494215ce/view

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT