Access the Full Project by Clicking here!
Bidjugde
JOB
Mineral King Road CA FTNP SEKI 13
BID DATE
11/6/24 - 2:00
AGENCY
Department Transportation
ESTIMATE
$35,000,000
SCOPE
The scope includes pulverization of the existing pavement, aggregate base placement, and asphalt paving of the roadway. Parking lots will be rehabilitated or paved to improve visitor access. Soldier pile walls, soil nail walls, and areas of special rock embankment will be constructed throughout the project to stabilize the roadway. The project also includes drainage improvements such as ditch paving and grading, inlet installation, culvert replacement, and inlet and outlet protection measures. 22,500 LF Ditch Excavation 1,900 CY Rip Rap 700 CY Special Rock Embankment 1800 SF Soil Nail Retaining Wall 6,500 Tons Roadway Aggregate, Method 2 7.5 Miles Full Depth Reclamation, Method 2 4.5 Miles Full Depth Reclamation, Method 2 with Cement 26,000 Tons Asphalt Pavement 380 LF Steel H Piles, In Place 9,800 LF 24" to 48" Culverts 70 Each Inlet (Concrete Box Inlet) 37,000 LF Paved Ditch, Asphalt 80 Each Dry Stacked Headwall https://sam.gov/opp/157d0a6bddd9440e9e02f8da71050370/view cflacquisitions@dot.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT