Access the Full Project by Clicking here!
Bidjugde
JOB
2025 Street Rehabilitation Toc Pkg 6
BID DATE
11/8/24 - 2:00
AGENCY
San Antonio
ESTIMATE
$10,000,000
SCOPE
Project construction may include but is not limited to: street reconstruction to include excavation, subgrade proofrolling and treatment, base reinforcement with geogrid, installation of hot mix asphaltic base and surface courses, flexible base course, concrete curbs, sidewalks, curb ramps, driveways, retaining walls, mailbox relocations, topsoil and sodding, signage and striping, tree removal and installation, speed humps, tackless tack coat, and minor utility adjustments to include adjustment of existing valve boxes, relocating customer shutoff valves, backflow preventers and pressure reducing valves, existing meter and meter box relocations, short and long service relays, adjusting and reconstructing existing manholes, and adjusting existing sanitary sewer cleanouts https://www.civcastusa.com/project/6706c38ae725767da2aece33/summary michelle.birch@sanantonio.gov
PREBID
10/22/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT