Access the Full Project by Clicking here!
Bidjugde
JOB
6130 North Beach Drainage Street Eco Park Improvements
BID DATE
11/13/24 - 2:30
AGENCY
Corpus Christi
ESTIMATE
$18,200,000
SCOPE
This project includes the construction of a new central drainage canal (4600 LF) between Timon and Surfside Boulevards for the collection, storage, and conveyance of Storm water. This canal will feature the construction of a linear park from Bushick Place (South) to the canal outfall at Timon Marsh (North) and connects to the proposed future Eco-Park. The linear park will feature pedestrian bridges that will provide connectivity between Surfside Park and Kiwanis Park. Park improvements include two (2) concrete pedestrian trails: 8-ft wide along Timon Boulevard and 10-ft wide along Surfside Boulevard, lighting, amd benches. Existing palm trees within the park area will remain unless they interfere with the construction of the canal. New trees include Honey Mesquites, Washington or Mexican Fan Palms, and Crepe Myrtles will be installed. Wastewater and water improvements will be proposed, including demolition of two (2) lift stations, and one (1) new lift station. The full-depth reconstructions of the entirety of Beach Avenue and Gulfspray Avenue are included in this project. Gulfspray Avenue will feature a 10-ft multi-use concrete path. https://www.civcastusa.com/project/66d86cad193bcd185a85e721/summary lesliec2@cctexas.com
UPDATES