Access the Full Project by Clicking here!
Bidjugde
JOB
Broadmoor Boulevard Mill Inlay
BID DATE
11/14/24 - 2:00
AGENCY
Rio Rancho
ESTIMATE
n/a
SCOPE
This project includes, as the base bid, an asphalt roadway mill and inlay of Broadmoor Blvd from Loma Colorado Blvd to Country Club Dr with new ADA compliant curb ramps, new lighting and signal improvements, a new drive pad and new thermo-plastic striping. An additive alternate #1 to remove and replace the existing asphalt pedestrian path from Loma Colorado Blvd to High Resort Blvd. An additive alternate #2 for Lakeview Circle, Turf Lane, Golfers Lane, and Links Lane which will install a new water line with new water service lines, hybrid mill and inlay (full depth reclamation) of the existing roadway. An additive alternate #3 on Broadmoor Blvd for the installation of a new water line in the north bound lane from Loma Colorado to Country Club Dr with connections to existing side street laterals and full depth roadway reconstruction in the northbound lane. An additive alternate #4 for Diez Y Ocho Ct to install a new water line with new water services lines and hybrid mill and inlay (full depth reclamation). dachavez@rrnm.gov https://rrnm-gov.bonfirehub.com/opportunities/157052
PREBID
10/16/2024 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT