Southeast Access Road Tech Ridge
BID DATE
10/31/24 - 3:00
AGENCY
St George
ESTIMATE
n/a
SCOPE
The BID includes the following: Construction drawing and Specifications for the Southeast Access Road at Tech Ridge. The project starts at 250 West just off of Black Ridge Dr., then traverses up the ridge line and connects onto Cloud Dr. in St. George UT. Major components of the project are summarized below: • Earthwork of Approximately 51,886 cy • Installing of 28,530 sf of Rock Retaining wall • Installing of approximately 4,000 feet of various size fused storm drainpipe. • Installing of approximately 3,300 feet of various size fused sewer pipe. • Installing of approximately 1250 feet of various size water pipe. • Installing of approximately 3,560 feet of power infrastructure. Paving approximately 170,000 square feet of asphalt. ccoats@allianceconsulting.us mary.wahl@sgcity.org