Access the Full Project by Clicking here!
Bidjugde
JOB
Antelope Palomas Low Flow Crossings Phase 2
BID DATE
10/28/24 - 1:30
AGENCY
Yuma County
ESTIMATE
$1,000,000
SCOPE
• Remove existing asphalt at Villella Wash, Smith Wash, Baragan Wash, Ramsey Wash, Slayton Wash, and Nine Mile Wash crossing the Antelope-Palomas Road. • Construction of asphalt concrete pavement low flow crossings and concrete cut-off walls at the six (6) washes crossing the Antelope-Palomas Road. • Install 12” thick cut-off walls on the upstream and downstream side of each of the six (6) washes. • Asphalt paving • Place signing and traffic paint striping at all washes. https://www.yumacountyaz.gov/Home/Components/RFP/RFP/459/663 jason.giard@yumacountyaz.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT