Pavement Rehabilitation Various Local Streets CDBG FY 23 24
BID DATE
11/5/24 - 2:00
AGENCY
Moreno Valley
ESTIMATE
$1,400,000
SCOPE
The work to be done consists of furnishing all labor, materials, necessary tools and machinery, supervision and coordination, traffic control, and all utility and transportation services required for the construction of street and drainage improvements that include but are not limited to: crack sealing, pavement surface removal and resurfacing, slurry sealing, striping and signing, installation of 24"" to 30"" reinforced concrete pipe storm drain lines, grate catch basins, manholes, and other related improvements on the streets as included in the Plans and listed in the Bid Schedule. https://procurement.opengov.com/portal/morenovalley/projects/69541/document?section=614646