(DESIGN BUILD) Chandler Blvd: 27th Avenue to 19th Avenue
BID DATE
05/3/15 - 2:00
AGENCY
Phoenix
ESTIMATE
$4,000,000
SCOPE
AWARD 5/16: The project consists of constructing a new half street design, cross-section D, on the north side of Chandler Boulevard within the existing 50-foot wide right-of-way (ROW) between 27th Avenue and 19th Avenue. The roadway will initially have one lane in each direction and two bicycle lanes. The north side will be fully developed with half-street landscaping, street lighting, and detached sidewalk. The project will potentially include a 10 foot wide Multi-Use Path (MUP) situated approximately 20 feet north of the new north curb line. The south side will have a Maricopa Association of Governments (MAG) thickened pavement edge. All necessary drainage crossings shall be designed to full development width (100-foot ROW). The DB team will be responsible for generating geometrics for Chandler Boulevard, and identifying slope and drainage easement needs. The DB team will be responsible for all 404 permits at the drainage crossings and following all applicable environmental mitigation measures.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT