Buckhead Mesa Landfill Center Pond Interim Leachate Piping
BID DATE
10/17/24 - 1:00
AGENCY
Gila County
ESTIMATE
n/a
SCOPE
Under the current scope of work, interim piping will be constructed to remove the Center Pond from the leachate collection system in preparation for pond closure which will take place at a later date. Two leachate pipes will be connected, and the combined piping will be re-routed to the lined west pond. An 8” diameter PVC pipe drains the older clay-lined portion of the landfill. A 10” diameter SDR 17 HDPE pipe drains the newer double-lined section of the landfill. During normal conditions, the flow in each pipe is typically less than 5 gallons per minute. jsgroi@gilacountyaz.gov bhurst@gilacountyaz.gov