UT FLAP SLA 10 Mill Creek Canyon Road
BID DATE
11/12/24 - 2:00
AGENCY
Department Transportation
ESTIMATE
$30,000,000
SCOPE
The project consists of reconstruction and widening of Mill Creek Canyon Road from Big Water Trailhead to Elbow Fork (3.1 miles) to a 20-foot paved width and from Elbow Fork to Winter Gate (1.4 miles) to 24-foot paved width. 20101-0000 Clearing and Grubbing, 31.6 ACRE 20401-0000 Roadway Excavation: 53,500 CUYD 25201-0000 Special Rock Embankment 5,500 CUYD 252201-0000 Rockery (Retaining Wall) 3,100 SQFT 25902-0000 Soil Nail Retaining Wall 9,000 SQFT 30101-0000 Aggregate Base: 25,000 TON 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, ½-Inch or ¾-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 11,500 TON 60201-Various – CMP: 1,425 LNFT 60220-0000 Precast Reinforced Concrete Box Culvert: 140 LNFT 63501-0000 Temporary Traffic Control: LPSM CflContracts@dot.gov https://sam.gov/opp/3c23204880274bd9965da907c1d3f38c/view