Access the Full Project by Clicking here!
Bidjugde
JOB
TSH Construction Roadway
BID DATE
10/8/24 - 2:00
AGENCY
Terrell
ESTIMATE
n/a
SCOPE
1. Remove all trees and brush along the drive +/- 15’ both sides. 2. Remove existing gravel and install +/- 3’ to 4’ of select fill with a 1:1 slope on the sides. 3. Install Tensar Hx5.5 geogrid 4. Install 10” of crushed concrete or flexbase to provide a 24’ wide driving surface. jpotts@cityofterrell.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT