Access the Full Project by Clicking here!
Bidjugde
JOB
Southwest Berkeley Bikeway Bus Stop Improvements
BID DATE
10/22/24 - 2:00
AGENCY
Berkeley
ESTIMATE
$2,400,000
SCOPE
The work of each package is briefly summarized as follows: Package A - Parker Street to Addison Street Bikeway (Specification No. 24-11640-C) will install bike boulevard infrastructure consisting of striping, pavement markings and wayfinding signage along the corridor. The proposed corridors include Mabel Street and Bonar Street between Parker Street and Addison Street, as well as Parker Street between Mabel Street and 9th Street. The work consists of, but is not limited to, coordination with utility companies, nearby residents, businesses, and organizations; clearing and grubbing existing vegetation; saw-cutting; removal of existing pavement markings and raised pavement markers; removal of existing asphalt concrete, concrete pavers, curb, gutter, and sidewalk; construction of new Portland Cement concrete sidewalks, curb ramps, and median; installation of asphalt concrete pavement and speed tables; adjusting utility boxes and covers to grade; relocation of storm drain infrastructure; installation of pavement striping and markings; installation of curb paint; installation of signage; and landscaping. Package B - University West Bus Stop Improvements (Specification No. 24-11666-C) will construct new sidewalk and curb bulbouts, replace sections of curb, gutter and sidewalk, and install four electrified bus shelters along University Avenue between Bonar Street and Acton Street. The work consists of, but is not limited to, coordination with utility companies, nearby residents, businesses, and organizations; clearing and grubbing existing vegetation; saw-cutting; removal of existing pavement markings and raised pavement markers; removal of existing asphalt concrete, concrete pavers, curb, gutter, and sidewalk; construction of new Portland Cement concrete sidewalks, curb ramps, and bus stop pads; installation of new bus stop shelters and benches, including both solar-powered and hard-wired shelters; installation of asphalt concrete pavement; adjusting utility boxes and covers to grade; relocation of storm drain infrastructure; installation of pavement striping and markings; installation of curb paint; installation of signage; and installation of new traffic signal poles and associated traffic signal electrical equipment and systems. https://berkeleyca.gov/doing-business/working-city/bid-proposal-opportunities/southwest-berkeley-bikeway-and-bus-stop kjung@berkeleyca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT