Fairview 2024 Spring Pipeline Replacement
BID DATE
09/24/24 - 2:00
AGENCY
Fairview
ESTIMATE
n/a
SCOPE
Remove existing aerial pipe crossing northwest of Little Bear Spring Remove existing aerial pipe crossing northwest of Bear Bottom Spring (Lower Tollgate Spring) Install 1,200 feet of new 10” HDPE DR-17 pipe and connect to existing pipes as shown in plans Modify streambank downstream of Bear Bottom Spring (Lower Tollgate Spring) Replace two hatches on Bear Bottom Spring (Lower Tollgate Spring) collection box Replace hatch on Upper Tollgate Spring collection box Re-align road to be north of Bear Bottom Spring (Lower Tollgate Spring) Recorder@fairviewcity.com