SCOPE
This work shall include furnishing all labor, material, and equipment to complete the project 2024 Del Prado UTACS Mill & Overlay as described in the specifications and shown in the plans. Work includes adjustment of all utility vaults, water valves, manholes, etc. located in the existing pavement prior to milling and adjustment to grade after the overlay, 1” mill of the existing pavement, crack sealing of the milled surface, 1” UTACS Type 1 overlay. This work shall also include the removal and replacement of existing access ramps and installation of new access ramps, curb and gutter and driveway removal and replacement at locations that will be marked in the field. All access ramps are to meet ADA/PROWAG requirements.