Access the Full Project by Clicking here!
Bidjugde
JOB
2024 2025 Street Overlay
BID DATE
09/16/24 - 3:00
AGENCY
Auburn
ESTIMATE
$849,908
SCOPE
The 2024/2025 - STREET OVERLAY PROJECT consists of road rehabilitation overlay work on all streets listed below: 1. Marion Way – Placerado Avenue to 126 Marion Way 2. Gum Lane – Canal Bridge to Bike Path 3. Maidu Drive – Auburn Folsom to Burlin Way 4. Shirland Tract – Maidu Drive to Grayhorse Drive (Additive Alternate) Additional work will include over-excavation in areas of poor structural integrity, planning of existing asphalt concrete along gutters and intersections, adjusting manholes and valve boxes to grade, ADA curb ramp rehabilitation, pavement restriping, and traffic control. Marion Way will consist of grinding and removing 4” of existing material. Then, work will consist of a 3” asphalt concrete overlay with Aramid Fiber over top a minimum of 4 inches of aggregate base. The bid item for aggregate base in these locations will include all work associated with compacting, leveling, and grading base to place 3 inches of asphalt concrete above the surface. Gum Lane will consist of a 4” grind and recompact along the parking area in front of 100 Gum Lane and 102 Gum Lane as well as a 2” edge grind from the canal bridge to the beginning of the aforementioned parking area. A 2” overlay with Aramid Fiber will be placed overtop the path of travel from the canal bridge to the bike path trail edge. Maidu Drive will consist of a full width 4” grind and recompact from Auburn Folsom Road to Burlin Way with a 3” asphalt concrete overlay with Aramid fiber over top. Shirland Tract Road will consist of a 2250 square foot 4” dig out with a 3” asphalt concrete overlay with Aramid fiber over top. (Additive Alternate) https://www.auburn.ca.gov/bids.aspx?bidID=52 jtaber@auburn.ca.gov , 530-823-4211 ext. 111
PREBID
9/5/2024 11:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT