Access the Full Project by Clicking here!
Bidjugde
JOB
Kirby Street Pavement Rehabilitation
BID DATE
09/25/24 - 3:00
AGENCY
Hemet
ESTIMATE
n/a
SCOPE
The scope of work generally consists of but is not limited to removing and reconstructing failed asphalt concrete pavement over aggregate base, cold milling and overlaying existing asphalt concrete pavement, constructing a concrete cross gutter splash pad, slurry sealing existing asphalt concrete pavement, adjusting utility covers to grade, replacing traffic signal loop detectors after paving, re?establishing survey monuments after construction, and replacing traffic stripes, pavement legends, and raised pavement markers, all as shown on the attached approved plans and specifications. https://vendors.planetbids.com/portal/39477/bo/bo-detail/121570 csunds@hemetca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT