Access the Full Project by Clicking here!
Bidjugde
JOB
Batiquitos Pump Station Emergency Basin Rehabilitation
BID DATE
09/17/24 - 2:00
AGENCY
Leucadia Wastewater District
ESTIMATE
n/a
SCOPE
The Work generally entails: Preparing the emergency basin for demolition work; maintaining pump station service; demolishing miscellaneous hatches, piping, and appurtenances and salvaging items where specified; demolishing existing concrete walls and ceiling surfaces; repairing and restoring the existing concrete walls and ceiling; filling in penetrations; replacing access hatches; installing a salvaged pump, pedestal, railing and appurtenances; installing a sanitary plumbing drain line; installing a pump discharge line and installing salvaged pipe supports; installing a coating system on the restored walls and ceiling; installing additional miscellaneous field painting; maintaining site drainage, temporary facilities, lighting, environmental controls, access, security; implementing shoring and bracing; implementing traffic control if required; restoring disturbed areas and surface improvements to original conditions; and all miscellaneous work as shown, specified and directed. iriffel@lwwd.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT