Access the Full Project by Clicking here!
Bidjugde
JOB
East Municipal Parking Lot
BID DATE
09/11/24 - 10:00
AGENCY
Clear Lake Shores
ESTIMATE
n/a
SCOPE
Work of the Contract is for the construction of: a concrete paved parking lot measuring approximately 4,090 square yards, please note that concrete shall be treated with a white pigmented curing compound. Additional activities to include relocation of existing light poles with new electrical conduits, construction of perimeter curb and curb islands, resetting existing inlet grates, parking space striping, planting of vegetation, installation of irrigation lines, installation of traffic circulation striping and signage and installation of wayfinding signage. A section of the existing sidewalk on the south side of Aspen Road shall be removed for the installation of two (2) wheelchair ramps. Additional improvements are proposed at the intersection of Aspen Road and Clear Lake Road; the improvements include removal of bollards, pedestrian crosswalk striping and restriping, removal of handrail, and concrete sidewalk repairs related to the removal of a concrete curb ramp near the stop bar, to make the intersection compliant with the requirements of the Americans with Disability Act (ADA). https://www.civcastusa.com/project/66bf69302d3cfbd3f0fcd3aa/summary stanford.nguyen@collierseng.com
UPDATES