Access the Full Project by Clicking here!
Bidjugde
JOB
Dorrance Lane Reconstruction Phase 2
BID DATE
09/10/24 - 2:00
AGENCY
Meadows Place
ESTIMATE
$2,300,000
SCOPE
The project generally includes pavement reconstruction of Dorrance Lane between Oxford Glen Lane and approximately 25 LF past the dog park driveway. The project includes installation of 370 LF of storm sewer ranging in size from 24” RCP to 54” RCP, junction boxes and inlets. The project includes removing and replacing approximately 5,300 SY of concrete pavement, including driveways and sidewalk in the project area. The project also includes 1,600 L.F. of 8-inch water line replacement along with approximately 1,400 L.F. of rehabilitation of 12-inch and 10-inch sanitary sewer. https://www.civcastusa.com/project/66bd0831167edcb38abe14d7/summary ngoc.le@hdrinc.com remya.kumar@hdrinc.com
PREBID
8/27/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT