Access the Full Project by Clicking here!
Bidjugde
JOB
Community Facilities District No 18 Phase 2A Water Improvements
BID DATE
09/17/24 - 10:00
AGENCY
Folsom
ESTIMATE
$27,600,000
SCOPE
The work to be done generally consists of, but is not limited to, furnishing all labor, materials, and equipment to install approximately 19,600 linear feet of 24-inch ductile iron pipe or welded steel pipe transmission main from the City’s water treatment plant to the Iron Point Road crossing of East Bidwell Street. This includes but is not limited to all trenching and backfilling; all piping; all paving, retaining walls and at-grade improvements; all structural facilities, all geotechnical work, all site work and grading; subgrade and paving; tree protection; storm pipe and drainage improvements; erosion control; all electrical; and all miscellaneous work as shown on the Contract Drawings and included in the project documents. nstites@folsom.ca.us https://www.ciplist.com/plan/?Folsom/city/11984/plan/5565
PREBID
8/27/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT