(CMAR) Granite Reef Wash Phase 2B Pima Park
BID DATE
11/4/24 - 12:00
AGENCY
Scottsdale
ESTIMATE
n/a
SCOPE
Granite Reef Wash Phase 2B (this project) has several sections. • 36” to 54” pipe from 82nd St to PIMA Park detention basins with a 42” detention basin bleed off pipe to Pima Road storm drain. o Excavates 2 large detention basins with significant large diameter piping in Pima Park • 60” to 90” pipe from Sheridan to Coronado Road in 87th Street. • 48” bleed off pipe in 87th Street from Coronado Road to McDowell Road. • 96” Pipe, 10’x6’ Box and Channel from McDowell Road to McKellips Road and connection to the Phase 2A improvements which will be completed by summer of 2026. The Pima Park improvements include: • Eight or more Pickleball courts • Revised parking • Modified transit use • Modified trail system • Extensive landscaping emercado@scottsdaleaz.gov